Slider

specific search

Filter Your Search

Americas Projects

The Americas, or America, are the lands of the Western hemisphere or New World, comprising the continents of North America and South America with their associated islands and regions. America may be ambiguous in English, as it is more commonly used to refer to the United States of America. The United States has and most diverse economy in the world. Its the capitalist mixed economy, which is fueled by abundant natural resources, a well-developed infrastructure, and high productivity.

77093 - Document matches your request
showing 1 - 50
Page 1 - 1542
LOCATION DATE SUMMARY DEADLINE
Americas 05-Dec-2020 Tone Arch Bridge #27004 - Historic Bridge Over The Mississippi River In Mpls - Repair Ped/bike Bridge (ac Payback 2 Of 2).
N.A.
Americas 05-Dec-2020 Tone Arch Bridge #27004 - Historic Bridge Over The Mississippi River In Mpls - Repair Ped/bike Bridge- Pe Work (ac Payback 4 Of 4).
N.A.
Americas 05-Dec-2020 Mn 47, From Mn 65 To Just S Of 27th Ave Ne In Mpls - Bituminous Mill And Overlay, Sidewalks, Drainage And Ada Curb Ramps.
N.A.
Americas 05-Dec-2020 Mn 55 From E End Of 13th Ave To Jct Mn 62 In Mpls - Bituminous Mill And Overlay, Concrete Pavement Rehab, Sidewalk Repairs, Ped Ramp Upgrades, Aps, Guardrail, Pond Repair, Drainage.
N.A.
Americas 05-Dec-2020 Us 52, From 0.2 Ml N Of Cr 86 In Hampton Twp To 0.2 Ml N Of Csah 42 In Rosemount - Concrete Surfacing, Drainage, Cable Median Guardrail, And Repair Br# 19033 And 9675.
N.A.
Americas 05-Dec-2020 Metro Atp Setaside For Surface Transportation Block Grant Program Projects Yet To Be Selected For Fy 2023 For Chisago County.
N.A.
Americas 05-Dec-2020 Csah 610 From Csah 30 To Mn 610 In Maple Grove-construct New Four-lane Divided Highway (csah 610), New Bridge Over I94, Signal Improvements, Sidewalk, Multi-use Trail.
N.A.
Americas 05-Dec-2020 Upont Avenue, Cliff Road And I-35w S Ramp In Burnsville-ramp Reconstruction And Relocation (ac Payback 1 Of 1).
N.A.
Americas 05-Dec-2020 Bruce Vento Elementary School Ped/bike Improvements In St Paul-curb Extensions, Bicycling Facility, Sidewalk.
N.A.
Americas 05-Dec-2020 Oncord St (msas 235) At Us 52 In St Paul-replace Traffic Signals (associated To 6219-07 And 6219-07q) (ac Payback 1 Of 1.
N.A.
Americas 05-Dec-2020 Kellogg Blvd From St Peter St To Jackson St In St Paul-install Protected Bicycle Facility.
N.A.
Americas 05-Dec-2020 Fish Hatchery Trail From Battle Creek Park Entrance At Us 61 To The Intersection Of Fish Hatchery Rd/warner Rd In St Paul-reconstruct Ped/bike Trail.
N.A.
Americas 05-Dec-2020 Smith Ave (mn 149), Robert St (mn 952a), Plato Blvd (csah 40), Cesar Chavez St, Concord St (mn 156), Wabasha St-upgrade Traffic Signal Controllers, Install Fiber Optic Interconnect, Video Cameras, Revise Traffic Signals.
N.A.
Americas 05-Dec-2020 Hennepin Ave (msas 425) From Douglas Ave To Lake St In Mpls-reconstruct Roadway, Sidewalk, Traffic Signals, And Streetscaping.
N.A.
Americas 05-Dec-2020 I-69 Finish Line Project.
N.A.
Americas 05-Dec-2020 53rd Ave From Th 65 To 0.21 M W Of Th 65 In Fridley And Columbia Heights - Extend Center Median, Construct Turnabout.
N.A.
Americas 05-Dec-2020 Csah 103 From 74th Aveto 93rd Ave In Brooklyn Park-streetscaping And Transit Improvements.
N.A.
Americas 05-Dec-2020 70th Ave N From Camden Ave N To West River Rd In Brooklyn Center-construct 14-foot Wide Pedestrian / Bicycle Overpass.
N.A.
Americas 05-Dec-2020 Mn 252 At 66th Ave N In Brooklyn Center-construct Interchange, Convert To Freeway, Close Intersection At 70th Ave, Multiuse Trail, Noise Walls (associated To 109-010-007).
N.A.
Americas 05-Dec-2020 Mn 252 At 66th Ave N In Brooklyn Center-construct Interchange, Convert To Freeway, Close Intersection At 70th Ave, Multiuse Trail, Noise Walls (associated To 109-010-007f).
N.A.
Americas 05-Dec-2020 Olson Elementary And Middle Schools Pedestrian Safety Project In Bloominton-roadway, Driveway And Sidewalk Modifications.
N.A.
Americas 05-Dec-2020 Highway 101 Narrows Project.
N.A.
Americas 05-Dec-2020 Etrowide: Regional Travel Behavior Inventory And Regional Model Development. Household Travel Survey, Transit On Board Surveys, Special Generator Survey, Data Purchase, Regional Model Development And Update (ac Payback 1 Of 1).
N.A.
Americas 05-Dec-2020 Csah 38 From 1st Ave/ 21st St To Overpass At 20th St In Newport-construct Pedestrian/bicycle Trail.
N.A.
Americas 05-Dec-2020 Helmo Ave In Oakdale And Bielenberg Drive In Woodbury-construct New Bridge Over I94.
N.A.
Americas 05-Dec-2020 Various Locations County Wide: Install 40-50 Mi Of Ground In Reflective Lane Lines And Pavement Markings, Install Street Lights At Least 10 Rural Intersections.
N.A.
Americas 05-Dec-2020 Csah 78 (cr B2) At Csah 51 (lexington Ave) In Roseville - Widen Cr B2 To Provide Dedicated Right And Left Turn Lanes, Replace Signal System, Fya, Ada, Aps, Ped Ramps, Countdown Timers.
N.A.
Americas 05-Dec-2020 Csah 158 Over Cp Railroad In Edina-replace Bridge #4510, Roadway Approaches, Signal Modifications, Ada.
N.A.
Americas 05-Dec-2020 Building Project At 1450 Owens St..
N.A.
Americas 05-Dec-2020 410-acre Aramis Solar Project.
N.A.
Americas 05-Dec-2020 Affordable Housing Units On Henderson Road.
N.A.
Americas 05-Dec-2020 Nebraska Football Training Facility Project.
N.A.
Americas 05-Dec-2020 Csah 153 From 0.03 Miles West Of Washington St Ne To 0.03 Miles East Of Johnson St Ne In Mpls-reconstruct, Sidewalk, Ped/bike Improvements, Streetscaping, Signals, Ada.
N.A.
Americas 05-Dec-2020 Mn 252 At Csah 109 In Brooklyn Park-grade Separation, Retaining Walls, Safety Improvements, Ped/bike Improvements, Traffic Signals.
N.A.
Americas 05-Dec-2020 Csah 52 From Main St Se To 8th St Se In Mpls-bikeway, Ada, Signal Modifications, Intersection Crossing Improvements.
N.A.
Americas 05-Dec-2020 Csah 50 (rebecca Park Trail) From 0.13 Mi W Of Koala St To 0.11 Mi E Of Csah 92 (dogwood St) In Rockford And Greenfield - Eliminate Bypass Lanes, Restripe To Introduce Left Turn Lanes At Koala And Sterling, Wide To Construct Wb Left Turn Lane At Csah 92,.
N.A.
Americas 05-Dec-2020 Csah 17 (france Ave) From American Blvd In Bloomington To 76th St In Edina - Safety Improvements: Remove Raised Right Turn Islands, Upgrade Ped Ramsp, Aps, Off Road Facilities, Enhance Medians, Signal Upgrades Including Additional Signal Heads, Improved T.
N.A.
Americas 05-Dec-2020 Midtown Greenway Between Garfield Ave And Harriet Ave In Mpls - Construct Multi-use Trail, Retaining Walls, Ada.
N.A.
Americas 05-Dec-2020 Minnesota River Greenway From Cedar Ave To Rr Corridor West Of Lone Oak Rd In Eagan-construct Multi-use Trail.
N.A.
Americas 05-Dec-2020 H 5 At Csah 33/reform St In Norwood Young America - Construct Roundabout (associated To 1006-32) (tied To 1012-24, 1012-24s, 010-591-001) (ac Payback 1 Of 1).
N.A.
Americas 05-Dec-2020 Csah 83 (armstrong Blvd) At Alpine Dr In City Of Ramsey - Construct Roundabout.
N.A.
Americas 05-Dec-2020 Csah 35 (old Central) At Gardena Ave In Fridley - Construct Roundabout.
N.A.
Americas 05-Dec-2020 Csah 22 At Rum River In Oak Grove-widen Bridge #02546.
N.A.
Americas 05-Dec-2020 Csah 1 (coon Rapids Blvd) At Mississippi Blvd In Coon Rapids - Revise Signal System.
N.A.
Americas 05-Dec-2020 Operate Transit Service Improvement On Hennepin Ave, Lyndale Ave, 31st Street, And Bryant Ave In Mpls.
N.A.
Americas 05-Dec-2020 Purchase Three Diesel Buses And Upgrade Stations (widen Sidewalks, Add Improved Shelters, Information, Security, And Furnishings) On Route 6 In Mpls.
N.A.
Americas 05-Dec-2020 Operate Transit Service Improvement On Route 68 From 14th St And Jackson St To 5th Ave And South Ave In St. Paul, W St. Paul And S St. Paul.
N.A.
Americas 05-Dec-2020 Purchase 9 Expansion 60-foot Articulated Buses, Larger Vehicle Doors, And Technology Improvements For Hennepin Ave Corridor.
N.A.
Americas 05-Dec-2020 Ect 5309: Gold Line Bus Rapid Transit Line New Start Ffga Appropriation.
N.A.
Americas 05-Dec-2020 Rush Line Bus Rapid Transit Line New Start Ffga Appropriation.
N.A.
  • Show
  • Projects per page