Slider

specific search
Filter Your Search

Railway Signalling and Telecom Equipment Tenders

212 - Document matches your request
showing 51 - 100
Page 2 - 5
LOCATION DATE SUMMARY DEADLINE
Japan 23-Oct-2021 Kyushu Shinkansen (nishi Kyushu), Signal Equipment Property Arrangement Between Takeo Onsen Station And Nagasaki Station.
02-Dec-2021
Russian Federation 23-Oct-2021 The Performance Of Work On The Topic "development Of A Quantum Key Distribution System With A Quantum Repeater Based On Optical Memory".
11-Dec-2021
Russian Federation 23-Oct-2021 The Supply Of An Overhead Wire.
11-Nov-2021
Russian Federation 23-Oct-2021 The Performance Of Work On The Current Repair Of Anti-ram Devices.
29-Oct-2021
Switzerland 22-Oct-2021 Security Services And Rental Of Automatic Warning System (aws).
01-Dec-2021
India 22-Oct-2021 Provision Of Indoor And Outdoor Signalling Gears With Electronic Interlocking In Connection With Up-gradation Of Signalling Fron Std 1 To Std At 16 Stations..
23-Nov-2021
India 26-Oct-2021 Supply Of Large Catenary Suspension Bracket Complete With Fasteners.
15-Nov-2021
India 22-Oct-2021 Comprehensive annual maintenance contract (camc) for the electronic interlocking system of m/s. kyosan make at madurai yard for five years..
Estimated Cost: 7330000
12-Nov-2021
India 22-Oct-2021 Supply Spares - Signal Conditioning Module: Scm009a15;bh, Noise Level Transmitter Interface Board, System Mother Board: Bhelscan-bn10; Bhel, Pwr.supply Mother Board: Bhelscan-bn-10;, Relay Interface Module:rim280808, Bhel, Signal Interface Module:sim029l0.
30-Oct-2021
India 22-Oct-2021 Supply Of Road Safety Equipments – Cats Eye (heavy), Solar Cats Eye 3m, Long Heavy Barricades..
28-Oct-2021
India 22-Oct-2021 Interlocking Work.
Estimated Cost: 703894
11-Nov-2021
India 22-Oct-2021 Construction Of Interlocking Work From Prahlad Verma House To Damar Road In Village Veerpur.
30-Oct-2021
India 22-Oct-2021 Drain And Interlocking Work.
11-Nov-2021
India 22-Oct-2021 Supply Of Lamp Assembly Side Turn Signal Rh, Relay Turn Signal, Latch Assy Front Door Lh, Mirror Assy Inner Rear View, Liquid Gasket Three Bond 120, Tool Box, Bulb Parking Lamp (12v 5w), Bush..
01-Nov-2021
India 22-Oct-2021 Interlocking Repairing Work..
Estimated Cost: 736614
08-Nov-2021
India 22-Oct-2021 Drain And Rcc Road And Interlocking Construction Work.
Earth Filling, Retaining Wall, Drain And Soling Work.
Pavement Construction Work.
Construction Of Damaged Slab.
Construction Of Pump House..
27-Oct-2021
India 22-Oct-2021 Interlocking Work.
Estimated Cost: 235330
08-Nov-2021
India 22-Oct-2021 Supply Of Items: Hand Held Search Light,personal Safety Kit Reflective Luminous Garments,poly Carbonate Lathi,signal.
11-Nov-2021
India 22-Oct-2021 Comprehensive Annual Maintenance Contract Of Siemens Make Electronic Interlocking (westrace Mk-ii) System Of 06 Stations (digaru, Tetelia By Pass, Tetelia, Kamrup Khetri, Barahu And Jagiroad) In Agthori-dharamtul Section Of Lumding Division With Authorise.
Estimated Cost: 18342144
15-Nov-2021
China 22-Oct-2021 Procurement Of Signal System.
08-Dec-2021
Russian Federation 21-Oct-2021 Provision Of Services For The Replacement Of Glasses In The Navigation Pointers Established On The Objects Of Mk Md.
Estimated Cost: 2980506
27-Oct-2021
Russian Federation 21-Oct-2021 For The Right To Conclude An Agreement For The Supply Of Equipment Scs, Communications And Components.
Estimated Cost: 21442633
08-Nov-2021
Russian Federation 21-Oct-2021 Conclude An Agreement For The Performance Of Work On The Topic "development And Creation Of A Quantum Communication System Based On Continuous Variables".
Estimated Cost: 115000000
08-Nov-2021
Russian Federation 21-Oct-2021 The Provision Of Services For Replacing Glass In Navigation Signs Installed At The Facilities Of The Moscow Railway.
27-Oct-2021
Russian Federation 21-Oct-2021 The Performance Of Work On The Topic "development And Creation Of A Quantum Communication System Based On Continuous Variables".
08-Nov-2021
India 21-Oct-2021 Construction of ei buildings in connection with replacement of signalling gears at dhilwan, butari & mananwala stations on ldh-asr section & provision of elec. interlocking in place of panel interlocking at bes, tra & jnl stations on juc-asr section under.
Estimated Cost: 59330108
17-Nov-2021
India 21-Oct-2021 Supply Of Fabrication And Supply Of Engineering Indicator For Manned Level Crossings As Per Drawing No-ce/lc/sk-03 Speed Breaker Of 900mm Equilateral Triangle Normal Size Board With Definition Plat Of200mmx600mm Board Made Up Of Retro Reflective Sheeting.
28-Oct-2021
India 21-Oct-2021 Supply Of Fabrication And Supply Of Statutory Warning Boards As Per No. 146 & 160 Of Indianrailway Act. In Tri-lingual Languages (kannada, Hindi And English)made Up Of High Intensity Prismatic Type Ivsheeting Made Of 3m/avery Dennison Board Of 3mm Thick A.
28-Oct-2021
India 21-Oct-2021 Supply Of Fasteners, Ttgo Microcontroller With Gsm , Gps Module, Rp Sma Plug To Sma Jack For Box, Customization Of Pcb, Ip65 Weather Proof Abs Box, 2 Pin Industrial Connector, Power Connector, Power And Jumper Wire, 3.7v, 3000mah Lipo Battery, Charger, 9.
Estimated Cost: 369016
01-Nov-2021
India 21-Oct-2021 Repair And Maintenance With Material And Troubleshooting Of Ap Boxes, Indoor And Outdoor And Sector Antenna, Indoor Unit And Outdoor Unit Installed At Approx 25 Building Including College Department..
15-Nov-2021
Russian Federation 21-Oct-2021 The Supply Of Signaling Equipment, Communications And Components.
08-Nov-2021
India 21-Oct-2021 Supply Of Personal Alert Safety System Or Distress Signal Unit.
Estimated Cost: 5287248
04-Nov-2021
India 21-Oct-2021 Construction Of Buildings And Other Allied Civil Works In Connection With Upgradation Of Signaling Gears With Electronic Interlocking At Kupr, Nas, Hsx On Jrc-hsx Section Under Aden/jrc..
Estimated Cost: 15040605
15-Nov-2021
Bulgaria 20-Oct-2021 Collision Avoidance Systems.
Estimated Cost: 237160
17-Nov-2021
China 20-Oct-2021 China Railway Shenyang Bureau Group Co., Ltd. Newly Built Shenyang-baihe High-speed Railway (liaoning Section) Shenyang Hub Reconstruction Project Construction Management Supplies (15th Batch: 10kv Hi.
16-Nov-2021
Russian Federation 20-Oct-2021 Supply Of Equipment And Components For Signaling Systems.
Estimated Cost: 185123899
08-Nov-2021
Romania 20-Oct-2021 gligore?ti Ced Installation And Centralization Of The Line Unirea-razboieni-gligore?ti (computerized Command Post) (design And Execution) Srcf Brasov.
Estimated Cost: 27688432
22-Nov-2021
Bangladesh 20-Oct-2021 Supply Of Signal Bulb/light And Different Types Of Relay For Non-interlocked Color Light System.
01-Nov-2021
India 20-Oct-2021 Interlocking Tiles Fixing Work.
Estimated Cost: 783100
08-Nov-2021
India 20-Oct-2021 Drain Interlocking Work.
Estimated Cost: 307700
08-Nov-2021
India 20-Oct-2021 Drain Interlocking Fixing Work.
Estimated Cost: 777530
08-Nov-2021
India 19-Oct-2021 Composite Work For Panel Interlocking Along With Indoor And Outdoor Signalling & Telecom Work With Construction & Electrifications Of Service Buildings At 4 Stations (gorumahisani, Rairangpur, Kuldiha And Badampahar) In Tatanagar-badampahar Section In Div.
Estimated Cost: 91105830
09-Nov-2021
India 19-Oct-2021 Providing Electrification And Street Light In Sec-9 U/e Gharaunda (including One Year Free Mts/defect Liability Period Freeof Cost).
Supply Of Material (cp Fitting And Sanitary Ware).
Regarding Hiring Of Agency For Consucting The Written Exami.
12-Nov-2021
India 19-Oct-2021 Repair Of Cc Road.
Repair Of Damaged Drain And Crossing.
Building Construction Work.
Drain Wall Construction Work.
Construction Of Boundary Wall.
Drain Repair And Interlocking Construction Work.
Strom Water Drain Work..
Estimated Cost: 1998000
01-Nov-2021
India 19-Oct-2021 Repair Of Cc Road.
Repair Of Damaged Drain And Crossing.
Building Construction Work.
Drain Wall Construction Work.
Construction Of Boundary Wall.
Drain Repair And Interlocking Construction Work.
Strom Water Drain Work..
Estimated Cost: 1981900
01-Nov-2021
India 19-Oct-2021 Repair Of Cc Road.
Repair Of Damaged Drain And Crossing.
Building Construction Work.
Drain Wall Construction Work.
Construction Of Boundary Wall.
Drain Repair And Interlocking Construction Work.
Strom Water Drain Work..
Estimated Cost: 1964800
01-Nov-2021
India 19-Oct-2021 Providing And Fixing Telecom/ Epabx System With Kts With Cable Network Including Internal Wifi Fixtures During Rac For State Minister Cottages 1 To 16 And Hy. House,.
Estimated Cost: 664603
01-Nov-2021
India 19-Oct-2021 Interlocking Of 02 Lc Gates (jhs-gwl Lc 374, Kid-bzm Lc S-80) Of Jhansi Division (provision Of At Supply).
Estimated Cost: 1023099
18-Nov-2021
India 19-Oct-2021 1) Asn Divn : Electronic Interlocking Of West Down Receiving Cabin At Andal Yard. 2) Asn Divn : Electronic Interlocking Of East Empty Yard Cabin At Andal Yard..
Estimated Cost: 3169181
15-Nov-2021
India 19-Oct-2021 Provision of tc by msdac at critical location like waterlogged tcs in bds, ltg and doi station..
Estimated Cost: 15917653
12-Nov-2021
  • Show
  • Document per page

  • Whats app