Slider

specific search
Filter Your Search

Fabricated products and materials Tenders

12733 - Document matches your request
showing 1 - 50
Page 1 - 255
LOCATION DATE SUMMARY DEADLINE
India 16-Jun-2021 Supply Of Materials And Equipment In Gram Panchayat ,megwalo Ki Basti, Panchayat Samiti Gida (barmer).
25-Jun-2021
India 16-Jun-2021 Supply Of Materials And Equipment In Gram Panchayat ,shahar, Panchayat Samiti Gida (barmer).
25-Jun-2021
India 16-Jun-2021 Supply Of Materials And Equipment In Gram Panchayat ,shyampura, Panchayat Samiti Gida (barmer).
25-Jun-2021
India 16-Jun-2021 Lavatory Door Latch..
24-Jun-2021
India 16-Jun-2021 Electrode Shall Confirm To Specification No.aws A5.5 E 12018.......
29-Jun-2021
India 16-Jun-2021 Set Of Spares For Bearing Extractor Machine ,suitable Of Sum.......
29-Jun-2021
India 16-Jun-2021 Supply Of Ready Mix Cement Concrete At 4x250 Mw, Brbcl Nabinagar Thermal Power Project, Fgd System, Bihar..
25-Jun-2021
India 16-Jun-2021 Material Supply In Gp Ghewda.
23-Jun-2021
India 16-Jun-2021 Cont. Building And Material Suppler Gp Salariya.
10-Jul-2021
India 16-Jun-2021 Cont. Building And Material Supply Gp Aalu Ka Tala.
10-Jul-2021
India 16-Jun-2021 Round Nut For C.b.c. In Lhb Coaches.
06-Jul-2021
India 16-Jun-2021 Periodic Testing (15 Years) Of 2 Nos. Auto Lpg Underground Tank At 2 Alds Under Gujarat State Office..
03-Jul-2021
India 16-Jun-2021 Supply Of Pipe Fittings.
29-Jun-2021
India 16-Jun-2021 Providing And Fixing Collapsible Steel Shutters In Auction Platform At Sub Market Yard At Chauribihal..
Estimated Cost: 737955
29-Jun-2021
India 16-Jun-2021 Providing Lwss To Pc Habitations In Gp Bhargaon Kotli Dhanyara Uperli Surari Khalanoo Tehsil Sadar Distt Mandi Hp Providing Lwss Under Gp Nagdhar Navlay Deori Gharan Shiva Maihani Phase Ist Phase 2nd Tehsil Sadar.
Drilling Lowering Of Bore Well 50 M.
28-Jun-2021
India 16-Jun-2021 Providing Lwss Behna Khad To Balidhar Sanarli And Gowalpur Tebam.
Construction Of 1 No Pump House Up To 50 Hp Job No 2..
23-Jun-2021
India 16-Jun-2021 Providing Lwss Behna Khad To Balidhar Sanarli And Gowalpur Tebam.
Construction Of 1 No Pump House Up To 50 Hp Job No 3.
23-Jun-2021
India 16-Jun-2021 Providing Lwss Behna Khad To Balidhar Sanarli And Gowalpur Tebam.
Construction Of 1 No Pump House Up To 50 Hp Job No 4..
23-Jun-2021
India 16-Jun-2021 Providing Lwss Behna Khad To Balidhar Sanarli And Gowalpur Teban.
Construction Of 1 No Pump House Upto 50 Hp Job No 5..
23-Jun-2021
India 16-Jun-2021 Providing Lwss Behna Khad To Balidhar Sanarli And Gowalpur Teban.
Construction Of Balance Work 1 No Pump House Up To 50 Hp..
23-Jun-2021
India 16-Jun-2021 Providing Manpower For Operation And Maintenance Of Lwss Prohi Challeli In Tehsil Sadar For One Year..
25-Jun-2021
India 16-Jun-2021 Providing And Fixing M S Steel Railing And Gate On Road From Hari Niwas To Dr Bhoyal At Longwood In Ward No 1.
Estimated Cost: 625084
26-Jun-2021
India 16-Jun-2021 Deberwal Jamanwal Banmahog Jaboth Road Km. 0/0 To 8/300 Under Nabard Distt. Mandi Hp For The Year 2021-22.
Formation Cutting Deficiency R/wall, B/wall, Cross Drainage Matteling And Tarring , Parapets Drain Metal Beam Crash Barrier And Providing Sign.
Estimated Cost: 59928923
25-Jun-2021
India 16-Jun-2021 Construction Of Mahila Mandal Bhawan Kash Dumaihar Panyali Gehra Takred Road Km. 0/0 To 10/500 Under Nabard.
Formation Deficiency, R/wall, B/wall, Cross-drainage Work Interlocking Blocks, Matteling And Tarring Crash Barrier Parapets Drain And Provid.
Estimated Cost: 40381433
25-Jun-2021
India 16-Jun-2021 Construction Of Foot Over Bridge With Integrated Rain Shelter In Peb Structure Including Electrical Installation And All Other Related Works To Make The Fob Functional On Engineering, Procurement And Construction Epc Contract Basis At Chalaunthi..
13-Jul-2021
India 16-Jun-2021 Supply Of Pipe - Third Party Inspection Under Group-3.
05-Jul-2021
Mongolia 16-Jun-2021 Supply Of Telfer.
23-Jun-2021
Saudi Arabia 16-Jun-2021 Supply, Installation And Operation Of A Water Sprinkler System For Khamis Mushait General Hospital.
05-Jul-2021
Saudi Arabia 16-Jun-2021 Supply And Installation Of Light Insulating Shades For Windows In Classrooms And Laboratories.
01-Jul-2021
Saudi Arabia 16-Jun-2021 Securing Freon Cylinders For The Security Of Installations In The Riyadh Region.
27-Jun-2021
Bulgaria 16-Jun-2021 Delivery Of Construction Materials For Repairs On Request.
06-Jul-2021
India 16-Jun-2021 Supply Of Electronic--- Hasp And Staple 90 Mm.
23-Jun-2021
India 16-Jun-2021 Supply Of Belt V Ribbed, Fuel Filter, Cartridge Fuel Water Separator, Cartridge, Lub Oil Filter, Element: Air Cleaner Outer, Element: Air Cleaner Inner, Strainer 3, Element Filter Assy, Filter: Oil, H.
25-Jun-2021
Philippines 16-Jun-2021 Supply And Delivery Of Ductile Iron (di) Gate Valves (2nd Bidding).
07-Jul-2021
Philippines 16-Jun-2021 Supply Of Supply & Delivery Of Construction Materials For The Construction Of Nasuli Swip (second Posting).
Estimated Cost: 1793370
30-Jun-2021
India 16-Jun-2021 Supply Of For Cgi Sheet Fence.
Estimated Cost: 2598000
29-Jun-2021
India 16-Jun-2021 Supply Of For Chain Link Fence.
Estimated Cost: 1710000
29-Jun-2021
Turkey 16-Jun-2021 Galvanized Barbed Wire Will Be Purchased With Impregnated Wooden Fence Mast.
24-Jun-2021
Turkey 16-Jun-2021 Pres Panel Prefabricated Building Will Be Purchased.
01-Jul-2021
Turkey 16-Jun-2021 The Dortyol State Hospital Will Be Performed In The New Service Building And Internal Routing Signage Work.
30-Jun-2021
Uruguay 16-Jun-2021 Supply Of Installation And Change Of Poles And Column.
01-Jul-2021
India 16-Jun-2021 Emergent Work Regarding Setting Up Covid-19 Wards In Various Floors Of Super Speciality Building With Aluminum Partitions Walls, Doors, Windows,partical Board,wall Panelling, Sanitary Items & Other A.
25-Jun-2021
India 16-Jun-2021 Ss Roof Water Tank.
16-Jul-2021
Saudi Arabia 16-Jun-2021 Supply Of Led Headlights With Copper Locks, Hinges And Bolts For Lighting Doors - Al-rass Governorate Municipality.
28-Jun-2021
India 16-Jun-2021 Providing & Laying C.c. 1:2:4 In Steps Including Angle Nozing And Edge Wall C.c. 1:5:10 With 15% Plum And Angle For Railing In Ward No. 13 Krishna Nagar Special Repair And Maintenance Of Path From M.c. Toilet (bridge) To Vishnu Mandir Km 0/0 To 0/180.
Estimated Cost: 644370
02-Jul-2021
India 16-Jun-2021 Supplying Of Mazdoor For The Purpose Of Watching, Guarding And Regulating Of Dainala Sluice Gates At 10.10km In Day & Night Under Bhedia Irrigation Section No. Ii Of Guskara (i) Subdivision For The Period From July To October 2021..
Estimated Cost: 80798
25-Jun-2021
Tanzania 16-Jun-2021 Supply Of Tools And Plants For Tanga Port Under Framework Contract.
30-Jun-2021
Belarus 16-Jun-2021 Procurement Of Pevm (reinforced).
Estimated Cost: 108000
24-Jun-2021
India 16-Jun-2021 Supply Of Mild Steel Electrode 10 Swg,mild Steel Strip,mild Steel Round Bar,caster Wheel,mild Steel Sheet,ms Pipe.
Estimated Cost: 118740
26-Jun-2021
India 16-Jun-2021 Supply Of Seal,seal Cassette,link Track Rod,gaiter (track Rod End),joint Ball Track Rod, Gaiter,nut Castle.
25-Jun-2021
  • Show
  • Document per page