LOCATION DATE SUMMARY DEADLINE
India 27-Jan-2022 Providing Wiring Shifting And Installation Of 5 Nos 3tr Spacemaker In The Cdot Exchange 1st Floor Te Building.
Estimated Cost: 306925
04-Feb-2022
India 27-Jan-2022 Comprehensive Annual Maintenance Contract (amc) For Electronic Interlocking (medha Make) At Ynk, Tk, Mkl, Gbd, Hup, Mlsa And Gbb (7) Stations For 2 Years Over Sbc Division.
Estimated Cost: 8519350
01-Feb-2022
India 27-Jan-2022 Various Signalling Works On Bhusawal Division In Connection With- A)- Rebuilding & Rehabilitation Of Various Small Span Bridges (23 & 33 Nos) B) Track Renewal Works- "twr= 48.304 Tkms ,24.006 Kms In Igp-pc, 66.061kms In Pc-knw, 9.875 Kms In Bsl-bd ,19.685.
Estimated Cost: 15143059
21-Feb-2022
India 27-Jan-2022 A/r & M/o Motipur Dudar Majwar Road Km 0/0 To 4/0.
P/f Reinforced Cement Concrete M – 20 Grade Boundary Pillar In Km 0/0 To 2/300.
Improvement Of Gadda Nallah To Chanesh Road Km 0/0 To 12/700.
Improvement Of Narrow Reaches In Km 2/450 To.
Estimated Cost: 489182
01-Feb-2022
China 27-Jan-2022 Train Traction System Of Xiamen Rail Transit Line 4(houxi To Xiangan Airport)and Line 6(longjiangmingzhu To Huaqiao University) Project.
15-Mar-2022
India 25-Jan-2022 Road Zone - Lc Gates, Colony And Station Approach Road Etc..
Estimated Cost: 4428094
18-Feb-2022
India 25-Jan-2022 Road marking (thermoplastic and cat eye) and other work at different places.
Estimated Cost: 1000157
04-Feb-2022
India 25-Jan-2022 Road Marking (thermoplastic And Cat Eye) And Other Work At Different Places..
Estimated Cost: 1000157
04-Feb-2022
India 25-Jan-2022 Supply Of Mobile Network Signal Boosters (q3).
01-Feb-2022
India 25-Jan-2022 Supply Of Supply, Installation And Commissioning Of The Smps Based Ips, As Per Rdso/spn/165/2012 Or Latest 3.0 Or Latest For Mid Section Interlocked Lc Gate As Per Enclosed Drawing No. Sdo/ips/lc/oo7, In Re Area And Attached Documents.(lc Gates).
Su.
17-Feb-2022
India 25-Jan-2022 Supply Of Battery Operated Led Based Torch Light Cum Flashing Hand Signal Lamp
Supply Of Battery Operated Led Based Torch Light Cum Flashing Hand Signal Lamp Asper Rdso Spec. No.:rdso/spn /195/2008 Rev-2.2.
31-Jan-2022
India 25-Jan-2022 Supply Of Glued Joints - 360 Nos. And Sej - 48 Sets..
Estimated Cost: 6120204
15-Feb-2022
India 25-Jan-2022 Annual Repairing Contract (arc) Of Webfil Make Universal Fail Safe Block Interface (ufsbi) For A Period Of 03 Years In Kgp Division Of South Eastern Railway.
08-Feb-2022
India 25-Jan-2022 Design, Manufacturing, Supply, Installation, Testing And Commissioning Of Electronic Interlocking System (indoor & Outdoor) At Biratoli, Kusmahi, Balumath, Bukru, Phulbasia And Shivpur Station In Connection With Triple Line Between Tori To Shivpur In Divi.
Estimated Cost: 502098913
18-Feb-2022
India 25-Jan-2022 Signaling / Telecom Work Related To Utility In Connection With Closing Of Lc 7, 126, 162, 176/a, 169 & Bau Due To Provision Of Rob/rub On Bhusawal Division Of Central Railway & Indoor And Outdoor S&t Work Including Supply, Installation Of Signaling /telec.
Estimated Cost: 12082829
22-Feb-2022
India 25-Jan-2022 Shifting Of S&t Cables, Relocation Of Existing Apparatus Case, Foundation/erection/ Wiring Of New Apparatus Case, Installation, Testing & Commissioning Of Electrical Lc Gate & Sliding Barrier And Ibs Etc In Connection With Third Line Work In Apr-kte, In B.
Estimated Cost: 37887901
17-Feb-2022
India 25-Jan-2022 Construction Of Station Buildings In Connection With Replacement Of Signalling Gears At Dhilwan, Butari & Mananwala Stations On Ldh-asr Section & Provision Of Elec. Interlocking In Place Of Panel Interlocking At Bes, Tra & Jnl Stations On Juc-asr Section.
Estimated Cost: 59362345
21-Feb-2022
Italy 24-Jan-2022 Supply Of "slowdown Signals", Tender Code Dac.0263.2021 - Lot 1 Cig: 9035999643 - Lot 2 Cig: 903601102c - Lot 3 Cig: 9036025bb6..
Estimated Cost: 4298321
23-Feb-2022
India 24-Jan-2022 Improvement Of Black Spot On Various Roads Under Baddi Sub-division(manpura Section)
Providing And Laying Bituminous Concrete Speed Breaker, Cat Eyes, Thermoplastic Paint Strip, Signages, Crash Barrier.
Construction Of Retaining Wall Etc. At.
07-Feb-2022
India 24-Jan-2022 Installation Of Interlocking From Various Places..
Estimated Cost: 491000
10-Feb-2022
India 24-Jan-2022 Supply Of 130 Sq.mm Stranded Cadmium Copper Wire.
Supply Of 130 Sq.mm Stranded Cadmium Copper Wire As Per Rdso Spec No. Ti/spc/ohe/cat( Cu-cd)/0971 .
Supply Of 130 Sq.mm Stranded Cadmium Copper Wire As Per Rdso Spec No. Ti/spc/ohe/cat( Cu-cd)/.
28-Feb-2022
India 24-Jan-2022 Providing And Laying Of Bc30mm Thk Incl Corrn Wrk With Dbm50mm Thk Nd Apply Tc For Resurf On Exist Surface Berm Filling Thermoplastic Paint For Rdmarking Fixng Of Cat Eyes Fixng Of Delineators Bet Km31 To Km60 On Rd Kt Under 51rcc 50tf Proj Hmk In The Ut.
Estimated Cost: 28637000
16-Feb-2022
India 24-Jan-2022 Providing & Laying Of Bc30mm Thk Incl Corrn Wrk With Dbm50mm Thk Nd Apply Tc For Resurf On Exist Surface Berm Filling Thermoplastic Paint For Rdmarking Fixng Of Cat Eyes Fixng Of Delineators Bet Km22 To Km125 On Rd Dsdbo Under 113rcc 50tf Proj Hmk In The.
Estimated Cost: 121536000
16-Feb-2022
India 24-Jan-2022 Carry Out Various Development Works Through Path Department.
supplying And Fixing Of Molded Shank Raised Pavement Markers / Cat’s Eye Made Of Polycarbonate & Abs Moulded Body And Reflective Panels With Micro Prismatic Lens Capable.
Road Markin.
Estimated Cost: 178393
02-Feb-2022
India 24-Jan-2022 Supply Of Arm Band With Reflective Embroidered Writing ( Traffic Control ) Cgo , Reflector Baton . , Reflective Traffic Cone . Boq Title Traffic Reflector Items.
01-Feb-2022
India 24-Jan-2022 Supply Of Pa Mixer (q3) , Audio Digital Signal Processor (q3).
01-Feb-2022
India 24-Jan-2022 Supply Of Multi Instrument Hardware Boq Title Multi Instrument Hardware For Signal Conditioning And Analysis.
31-Jan-2022
India 24-Jan-2022 Ahmedabad - Viramgam - Samakhiyali And Viramgam-katosan Road Section : Ctr(p) - 4.350 Km , Isd 6.00 Km,tbr-2.66 Km And Tbr 26 Point & Crossing Under Jurisdiction Of Divisional Engineer (west) ..
Estimated Cost: 76782919
22-Feb-2022
India 22-Jan-2022 Replacement Of Over Aged Panel Interlocking Of Nkj- A & B Cabin.
Estimated Cost: 7488385
14-Feb-2022
India 22-Jan-2022 Supply, Installation Testing And Commissioning Of Ground Stack Subwoofer , Supply, Installation Testing And Commissioning Of Surround Sound Speakers , Supply, Installation Testing And Commissioning Of Multichannel Amplifier , Supply, Installation Testing.
03-Feb-2022
Kazakhstan 22-Jan-2022 Tmc (firecracker) Cé.
28-Jan-2022
Kazakhstan 22-Jan-2022 Supply Of Firecracker).
28-Jan-2022
India 22-Jan-2022 Drain interlock construction work.
Estimated Cost: 663271
02-Feb-2022
India 22-Jan-2022 Supply Of Obstacle Signal Transmitter Pole On Ground Track Including Installation And Testing Charges For Skill Driving Track Boq Title Obstacle Signal Transmitter Pole On Ground Track.
31-Jan-2022
India 22-Jan-2022 Supply Installation Commissioning Of Matlab With Artificial Intelligence And Digital Signal Processing Toolbox..
02-Feb-2022
India 21-Jan-2022 Part Supply Of Signaling Material, Installation, Testing, Commissioning & Modification Of 06 No. Interlocked Level Crossing Gate In Connection With Shifting Of S&t Equipment In Gandhidham -bhuj Section Of Division..
Estimated Cost: 10704147
21-Feb-2022
India 21-Jan-2022 Supply Of Stand-alone Digital Signal Processor Along With Associated Software (q3).
11-Feb-2022
Lithuania 21-Jan-2022 Purchase Of Railway Track, Switch Construction Materials, Granite Chippings - Phase I..
31-Jan-2022
India 21-Jan-2022 Drain Repairing And Interlocking Work..
Estimated Cost: 1578000
07-Feb-2022
India 21-Jan-2022 Installation & Operation Of Pedestrian Signal System At Intersections..
Estimated Cost: 4928500
01-Feb-2022
India 21-Jan-2022 Design, Manufacture, Supply, Installation, Testing And Commissioning Of Solid State Interlocking (electronic Interlocking) System Conforming To Rdso/spn/192/2019 Ver. 2.0 With Latest Amendments In Connection With Provision Of Up & Dn Loop Lines At Deo Roa.
Estimated Cost: 48684431
15-Feb-2022
India 21-Jan-2022 Supply Of Tpin S-d Fn 400amp Having Main Switch Co
Supply Of Tpin S-d Fn 400amp Having Main Switch Confirming To Iec60947-3,pole - 3+neutral, 415volt, 690insulation Voltage,50/60hz, Operational.
27-Jan-2022
India 20-Jan-2022 Supply Of Dry Cell Battery Lamp
Supply Of Dry Cell 04 Battery Operated Led Based 7 Led White , 2 Led Red & 2 Led Green Tri Color Handsignal Lamp With 04 Nos. Alkaline Lr-20 Cells. As Per Rdso Spec. No. 2000/tr/281/tl(rev.0) 30.09.2002..
31-Jan-2022
India 20-Jan-2022 Interlocking Work In Sark Road Kotdi Km 0/0 To 2/0..
27-Jan-2022
India 20-Jan-2022 Grant Of Permission To Install Bts Equipment Along Various Flyovers/ Subways Of Msrdc In And Around In Following Sections On ‘as Is Where Is Basis’ For A Period Of 5 (five) Years.
Grant Of Permission To Install Bts Equipment On 429 Poles Along Vario.
01-Feb-2022
India 20-Jan-2022 Design, Manufacture, Supply, Installation, Testing And Commissioning Of Electronic Interlocking System At Ksta, Rfj, Bhkh & Pes In Ddu Division Of E.c. Railway, Including All Indoor & Outdoor Signalling Works..
Estimated Cost: 223320728
16-Feb-2022
India 20-Jan-2022 Supply Of 6 Finger Interlock Unit Complete
6 Finger Interlock Unit Complete.
24-Mar-2022
India 20-Jan-2022 Providing Road Safety Provisions Near Pelican Signals At Km 516/0-2, 519/8-10 And Km 523/6-8 On Pune - Hyderabad Section Of Nh-65..
Estimated Cost: 1932544
02-Feb-2022
India 20-Jan-2022 Electrical Work In Connection With (1)ratlam - Khandwa Section :- Upgradation Of Manned Lc No 198, 203, 206, 209, 210x On The Basis Of Atvu (2)ujjain-bhopal Section- Interlocking Of Manned Lc Gate No.08 (km 16/08-10),& 20 (km 40/14-16) Ujn -bpl Section (0.
Estimated Cost: 869949
16-Feb-2022
India 20-Jan-2022 Civil Engg. Works In C/w Upgradation & Interlocking Of 02 Manned Lc Gates (lc No. 10 At Km 7/0-1 & 30a At Km 47/6-7) In Hsr-sdlp Section Under Aden/ N.w.rly-sadulpur..
Estimated Cost: 1748209