Location | Date | Summary | Deadline |
---|---|---|---|
Iran Islamic Republic of | 29-Jun-2022 |
Provide Valve Made In Iran |
02-Jul-2022 |
Iran Islamic Republic of | 29-Jun-2022 |
Provide Gate Valve Made In Iran |
09-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Various Cable |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Required Joint |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Turbo Compressor |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Required Ejector |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Propylene Loading Arm |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Propane Loading Arm |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide Control Valve For H-1501 |
11-Jul-2022 |
Iran Islamic Republic of | 24-Jun-2022 |
Provide 15 Desert Bus Volvo B7 Type 3 And B9 And Scania Model Mraal And Man And Renault With Staff |
30-Jun-2022 |